Wood or steel

Price the lumber first.

Then read this. Most people who end up with a steel shed started by pricing a wood one, and the receipt is the reason they switched. Same footprint, same skills, same weekend you had set aside. Here is every line of both, so you can decide with numbers instead of a sales pitch.

No account, no obligation, and nothing is for sale yet.

The receipt

Eleven lines, or one.

An 8ft by 10ft shed, built to the same spec both ways. The wood column is what the register adds up to across the trips it takes to gather it. The steel column is what arrives on the pallet.

Building it in wood

11 line items
Pressure-treated skids and floor frame$268
Three-quarter inch plywood floor deck$186
Wall studs, plates, and headers$242
Roof rafters and ridge board$154
OSB sheathing, walls and roof$231
House wrap and roofing felt$58
Asphalt shingles and drip edge$196
Siding panels and corner trim$289
Door hardware, hinges, and latch$74
Nails, screws, brackets, and caulk$87
Primer and two coats of exterior paint$65
Materials, delivered$1,850

Building the same shed in steel

1 line item
Garden 8x10 kit, cut to your drawing$1,640
Fasteners, brackets, and ground anchorsIn the kit
Offcuts and wasteNone
PaintFactory finish
Materials, delivered$1,640

What the lumber receipt does not show

  • Three trips back for the thing that was not on the list
  • A rented miter saw, or borrowing one and returning it late
  • Around one sheet in nine lost to offcuts you cannot use
  • A tarp, because the framing gets rained on before it is closed in

National average material pricing, August 2026. Excludes the foundation, which is the same job either way.

Year ten

The number nobody prices.

A shed is not a weekend, it is a decade. This is the same 8x10 ten years on, assuming you keep up with it rather than letting it go.

Wood, ten years in

4 bills
Day oneMaterials$1,850
Years 3, 6, and 9Scrape, prime, and repaint$400
Year 6Rehang the door as the frame racks$90
Year 9Cut out and replace the soft base plate$240
Ten-year cost$2,580

Steel, ten years in

1 bill
Day oneMaterials$1,640
Every springRinse it with a hoseFree
Year 10Panel finish, still soundFree
Ten-year cost$1,640

DifferenceThe gap is not the sticker price. It is the three Saturdays of scraping and painting that come with the cheaper-looking option.

$940

Assumes an unshaded yard in a four-season climate and an owner who does the work themselves.

The weekends

Same shed. Seven times the hours.

Elapsed hours with two people working, which is how anyone actually builds one of these. The foundation is left out of both columns because a level gravel pad is the same half day whichever material goes on top of it.

Wood

56 hr on site

Three to four weekends, and one of them will rain.

Floor frame and deck7 hr
Wall framing10 hr
Roof framing and rafters8 hr
Sheathing, walls and roof6 hr
Felt, shingles, and drip edge7 hr
Siding and trim9 hr
Hang and adjust the door3 hr
Prime and two coats of paint6 hr
Hours on site56 hr

Steel

8 hr on site

One Saturday, and you are sweeping up by four.

Unpack and sort the pallet0.5 hr
Bolt down the floor frame1 hr
Stand and screw the wall panels2.5 hr
Set the roof panels and ridge2 hr
Hang the door and the vents1 hr
Trim, sealant, and a walk-round1 hr
Hours on site8 hr

Nothing in the steel column involves cutting. Every panel, every piece of framing, and every fastener is made for the drawing you made, numbered, and packed in the order the instructions call for it.

The objections

Everything you have heard about metal sheds.

Most of it comes from the thin, unframed panel boxes sold flat-packed at big-box stores. That is a fair thing to have a low opinion of. It is not what this is.

Noise

They are deafening in the rain.

That is a panel hanging free, drumming. Screwed down to framing on a 16-inch grid, a steel roof is closer to a tile roof than a tin can. If the shed sits under a bedroom window, the insulation option takes it below what you hear from an attic.

Condensation

They sweat inside and everything rusts.

Condensation is an airflow problem, not a metal problem, and a sealed wood shed does it too. Every design ships with ridge and soffit venting sized for the footprint, and the tool adds a vapor break under the floor when your climate needs one.

Hail

One hailstorm and it is a golf ball.

Ribbed 26 gauge panels take hail far better than the flat sheet people picture, and 24 gauge better again. A dent in a ribbed panel is cosmetic, and the structure behind it does not care. Shingles, by comparison, lose granules every single storm.

Rust

The cut edges will rust out in a few years.

Nothing is cut on site, which is the whole point of cutting to your drawing. Every edge is a factory edge, sealed on the line, on a galvanized substrate under a coated finish. That is why the finish holds up where wood trim would not.

Looks

It will look like a shipping container in the garden.

It looks like whatever you draw. Wall color, roof color, trim, windows, skylights, and door placement are all yours, and you can see the whole thing before you order a single panel.

Fixing

You cannot hang anything on the walls.

This one is half true, and it is the honest limit of the whole idea. See below.

The other side

When you should build in wood.

We would rather lose the sale than have you find this out in month four. If any of these three is you, buy the lumber.

You improvise as you go

If the plan is to cut a new window next spring, notch a stud for a conduit run, and screw a shelf wherever a shelf turns out to be needed, wood does that with a jigsaw on a Sunday afternoon. Our framing is pre-punched on a 16-inch grid, which covers hanging and shelving, but it is a grid, not a blank sheet.

It has to match a wood house

Steel takes any color you like, and it still does not read as clapboard from ten feet away. If the shed sits in the sight line from the kitchen window of a wood-sided house, or an HOA has written the material into the covenant, that argument is over before it starts.

You want to fix it with what is in stock

A damaged wood panel is a trip to any hardware store in the country. A damaged steel panel is a replacement part cut to your drawing, and it is not a same-day fix. Most people would take the wait. Some would not.

Wood wins on one thing: you can cut into it with a jigsaw on a Sunday afternoon and nail a shelf anywhere. Our framing is pre-punched on a 16-inch grid, which covers most of it, but if you want a fully improvisable building, build in wood. We would rather tell you now.

Decide with numbers

Draw it before you buy anything.

The design tool is free and it prices your shed as you draw it, so you can put a real number next to the lumber quote instead of a brochure. It opens soon, and the list gets in first.

Kits from $1,640 (sample price, see pricing note)Design free, price updates as you draw, nothing ordered until you say so
Start designing, free