Start to finished

From an empty corner of the yard to a locked door.

Four steps, and only one of them is work. Here is all of it in order, including the parts nobody puts on a website: what the truck does, what you have to have ready before it turns up, and what the hard hour of the day is.

Written for someone who has never built anything. That is most people.

0120 minutes, on the couch

Measure your spot

Enter the footprint, height, and door placement you want. Put in your zip code and the tool holds the design to your local snow, wind, and seismic loads.

What you do

Walk out to where the shed is going with a tape measure and write down three numbers: how wide, how deep, and which way the door should face. Then check the slope by eye. That is the entire homework.

What we do

Your zip code pulls the snow, wind, and seismic loads your county actually enforces, so the design is held to your local code from the first line you draw rather than at the end when it is expensive to change.

  • Measure the footprint and leave three feet clear on every side to build in
  • Note which way the door faces, and whether a mower has to turn to reach it
  • Look for the slope, the drainage, and the buried services before anything else
  • Check your setback from the fence line, which is the rule towns enforce most
02An evening

Design it

Drag doors, windows, vents, skylights, and shelving into place. The material list and the price update with every change, so you never design something you cannot afford.

What you do

Drag doors, windows, vents, and shelving into place and watch the price move with every change. Free to use, free to save, and free to change your mind eleven times.

What we do

The tool holds the design inside what your local loads allow and prices the material list live, so nothing you can draw is something we cannot cut.

Coming soon

There is nothing to click here yet.

The design tool is still being built, so we are not going to show you a picture of one. When it opens you will draw your shed in a browser, see the material list and the price update as you go, and send the drawing straight to the saw. Until then, the honest version of this section is an empty box and a date we do not have yet.

03While you prep the pad

Get the exact kit

We cut the panels and framing to your drawing, number every part, and ship it on one pallet with the hardware sorted by step.

What you do

Build the pad while the kit is being cut. That is the one job that has to be finished before the pallet arrives, and it is the one job the kit cannot do for you.

What we do

Every panel and every piece of framing is cut to your drawing, punched, labeled with the number the instructions call it by, and packed in the order you will reach for it. Then it goes on one pallet and onto a truck.

  • The pallet needs about eight feet of flat ground within wheelbarrow range
  • Open it and check the packing list against the parts before build day
04Saturday, 8am to 4pm

Build it

Follow the instructions the tool wrote for your shed, not a generic manual for a shed you did not design. Two people, a drill, and a ladder.

What you do

Two people, a cordless drill driver, a ladder, and a tape measure. No saws, no nail gun, and no cutting, because every part already fits.

What we do

The instructions were written for your shed, so step nine refers to the panel stamped nine, and the torque spec for every fastener is on the page you are looking at.

  • Start early. The hard hour is standing the walls and it is easier in still air
  • Panels go up in a set order and each one squares the last, so do not skip ahead
  • Every fastener has a torque spec, and overdriving a screw is the one common mistake
  • Anything damaged or cut off spec is replaced free, and you keep building around it
Delivery day

One pallet, and everything on it is numbered.

The difference between this and a lumber delivery is that nothing on the pallet is raw material. There is no pile to sort, measure, and cut down. Every piece is already the piece it is going to be.

Panels, stacked in build order

Wall panels under roof panels, each stamped with the number the instructions use. The one you need first is on top.

Framing, pre-punched

Galvanized floor and wall framing on a 16-inch grid, drilled at the factory. Nothing gets measured or marked on site.

Hardware, sorted by step

Screws, brackets, closure strips, and sealant in labeled bags, one bag per step, so you are never counting fasteners out of a bucket.

A build plan for your shed

Printed and digital, generated for the design you drew, with the torque spec for every fastener and a packing list to check against.

Saturday

What the day actually looks like.

A Garden 8x10 on a pad that is already down, two people, starting at eight. The larger kits run longer but the order of the day is the same.

8:00 am

Unpack and sort

Cut the banding, lay the parts out in the order the plan lists them, and check the packing list. Thirty minutes here saves an hour later.

8:30 am

Floor frame down and leveled

The frame goes on the pad, gets squared by measuring the diagonals, and gets anchored. Everything above this is only as square as this is.

9:30 am

Wall panels upThe hard stretch

The long stretch, and the one that needs two people. Panels stand, get screwed to the frame, and square each other as they go. Do not skip ahead in the order.

12:00 pm

Roof panels and ridge

Up the ladder, panels overlap into the ribs, ridge cap last. This is the hour to have someone on the ground handing things up.

2:00 pm

Door and vents

The door hangs on its frame and gets adjusted until it closes with one hand. The vents are four screws each.

3:00 pm

Trim, sealant, and a walk-round

Corner trim, sealant at the ridge, then walk the whole thing looking for a screw you missed. There is always one.

4:00 pm

Done, and it locks

Sweep it out, put the mower in, and stand in the doorway for a minute. That part is not optional.

Add half an hour if you stop for lunch, and add a person for anything bigger than the 8x10. Nobody should be holding a fourteen foot panel in wind on their own.

Before the truck

Have these four things ready.

This is the whole list. If all four are true on the morning of delivery, build day goes the way the timeline above says it does.

A level pad, finished and settled

Gravel or slab, built to the depth and area the tool worked out for your design. It wants a few days to settle, so it is the first job, not the last.

A second person for the Saturday

Not a builder. Someone who can hold a panel upright and hand you a screw. The whole design assumes two pairs of hands for about three hours of the day.

A drill driver, a ladder, and a tape

A charged cordless drill with a spare battery, a step ladder tall enough to reach the ridge, and a tape measure. That is the tool list, in full.

Somewhere flat to put a pallet

About eight feet of firm ground the truck can lower onto, within wheelbarrow distance of the pad. A driveway is ideal. A soft lawn in February is not.

If something is wrong

Parts get replaced, not argued about.

If a part arrives damaged or cut off spec, send a photo and we ship the replacement free. You keep building around it, because the parts go up in an order and there is almost always something else to do while it is on its way. The tool will not let you order a design that fails your local load requirements in the first place, which is the expensive kind of wrong to catch late.

Ready when you are

The hardest part is deciding the size.

The tool opens soon and the list gets in first, at the founding-builder price. Until then, the kits page has the three starting points and every dimension we would cut them to.

Kits from $1,640 (sample price, see pricing note)Design free, price updates as you draw, nothing ordered until you say so
Start designing, free